Skip to content

Implement a small approved change ​

This is a focused procedure. For its place in a larger workflow, see Implement a planned task.

The requested behavior and authority to change it are already clear.

Finish with: A scoped implementation with behavior checks and affected documentation updated.

Read the diagram ​

Implement a small approved change: suggested skill handoffs with approval stops where applicable.

Open interactive diagram · Download SVG · Editable candidate

Arrows show this suggested sequence, not declared requires dependencies. Approval arrows are conditional. Declining a gate stops that branch without authorizing its writes. The numbered steps below are the text equivalent of the diagram.

Before you start ​

Use a trusted project and follow its instructions. Confirm the requested scope, installed skills, runtime tools, and any required workspace or approval. This selection includes the catalogued instruction requirements coding. Resolve them before use.

Steps ​

  1. Create task branch. isolated-workspace provides the guidance for this step.
  2. Load applicable rules. coding-with-rules provides the guidance for this step.
  3. Implement and test behavior. coding provides the guidance for this step.
  4. Update affected guidance. document-project provides the guidance for this step.
  5. Account for quality gates. coding provides the guidance for this step.

Where to stop ​

Do not run initiative, research, and specification merely to fill a pipeline. Follow target policy for approval and documentation requirements.

Optional branches ​

  • Choose tdd when you explicitly want test-first feature or bug work, or integration-test slices through public behavior.
  • Choose code-review when you want changes since a fixed commit, branch, tag, or merge-base checked against both standards and the originating specification.
  • Choose debloat when a design risks unnecessary machinery or existing code and configuration have complexity that no longer earns its cost.

Optional branches are not prerequisites or permission to launch another phase. You can omit them or stop at the stated result. See relationship types for the distinction.