Skip to content

Turn a completed issue into a small improvement ​

This is a focused procedure. For its place in a larger workflow, see Supporting tools and additional workflows.

A bounded work period has enough evidence to examine the process.

Finish with: A few actionable improvements, with follow-up authority separated from the retrospective.

Read the diagram ​

Turn a completed issue into a small improvement: suggested skill handoffs with approval stops where applicable.

Open interactive diagram · Download SVG · Editable candidate

Arrows show this suggested sequence, not declared requires dependencies. Approval arrows are conditional. Declining a gate stops that branch without authorizing its writes. The numbered steps below are the text equivalent of the diagram.

Before you start ​

Use a trusted project and follow its instructions. Confirm the requested scope, installed skills, runtime tools, and any required workspace or approval. No additional instruction requirement is recorded for these selected steps.

Steps ​

  1. Bound period + evidence. retro provides the guidance for this step.
  2. Check causes vs impressions. retro provides the guidance for this step.
  3. Check causal evidence. retro provides the guidance for this step.
  4. Propose small follow-ups. retro provides the guidance for this step.

Where to stop ​

Stop at proposals; tool changes, instruction edits, cleanup, and publication need their own approval. Use the optional wait-what branch only when the retrospective's explanation needs more context or clearer terms.

Optional branches ​

  • Choose instruction-maintenance when instruction routing, dependencies, metadata, or policy documents appear missing, stale, conflicting, or unsuitable.
  • Choose document-project when implementation changes how readers use the project, or existing documentation blocks a real developer task.
  • Choose wait-what when the last answer is hard to understand or omits context needed to follow the current proposal.

Optional branches are not prerequisites or permission to launch another phase. You can omit them or stop at the stated result. See relationship types for the distinction.